Enviro Earth would need, as part of a preliminary
project in Tarawa, Kiribati, an estimate for the following
work on a site accessible by road and located near
the port:
Excavation and construction of one concrete block
approximately 0.8 0.8 0.8 m in size
And four additional blocks appr ..